Permits, ground conditions and how the work gets done across Whidbey Island & Island County.

A footing drain sits beside the footing under at least 6 inches of rock. A French drain clears wet yard ground. Where each goes on an Island County lot.
Read more →
Best gravel for a driveway in Island County: crushed rock in layers. Quarry spalls on soft ground, 1 1/4 minus base, 5/8 minus top, crowned about 4 percent.
Read more →
A curtain drain catches water from uphill. A French drain clears the low spot. Choosing for a wet Island County lot, plus the 30 and 10 foot septic setbacks.
Read more →
Yes, almost always. In Island County, mark the dig area in white and call 811 at least two full business days ahead. What the marks mean and what 811 skips.
Read more →
Yes. In unincorporated Island County, tearing down a house takes a demolition permit, an AHERA asbestos survey and an NWCAA notice with a 10-day wait.
Read more →
In Island County a driveway needs no building permit, but a new entrance onto a county road needs a Public Works access permit before the building permit.
Read more →
When Island County requires a clearing and grading permit on Whidbey Island: the 500 cubic yard line, two acres to bare earth, shoreline and steep slope ground.
Read more →
In unincorporated Island County a retaining wall 4 feet or less with no surcharge needs no building permit, and the 4 feet starts at the bottom of the footing.
Read more →Need land cleared, a lot graded, a driveway put in, drainage fixed, or a storm mess hauled off? Reach out for a free, no-obligation estimate. We’ll look at the ground with you, give you a written price, and get your job on the schedule.
Tell us about your project — we’ll get right back to you.